Our portfolio of projects has been extensive and diverse in the nature. We have completed a variety of construction objects which vary in complexity. These include but are not limited to residential buildings, business and shopping centres, roads and highways, water supplies and sanitation systems, fibre optics, processing plants, ports and an airport control tower. Gener 2 has created a significant footprint in the residential field of construction where almost every area of the capital is marked with one of our buildings.
One of the most significant projects of Gener 2 is the Trans Adriatic Pipeline (TAP) a natural gas pipeline project that starts in Greece, crosses Albania and the Adriatic Sea and comes ashore in Southern Italy. The TAP route onshore in Albania is about 211 km in length and is planned to pass through Bilisht, Korce, Skrapar, Berat and Fieri Regions. Gener 2 is awarded the construction and upgrading of roads and bridges in Albania, a project that is nearly its completion. (For more info click here).
Evidence of our successful approach can be seen from the completion and ongoing process of the below enlisted projects.